Raytek CI OPTION -M - CI OPTION 18Mx1 metric threaded housing *** LEAD TIME IS 10 - 12 WEEKS *** Raytek CI OPTION is available through HeatSource.
-
Raytek MI3 Calibration Certificate (must be ordered at time of new purchase) XXXMI3CERT - MI3 Calibration Certificate (must be ordered at time of new purchase) Manufacturer's Calibration Certificate (based on NIST/DAkkS certified probes) *** LEAD TIME IS 10 - 12 WEEKS *** Raytek MI3 Calibration Certificate (must be ordered at time of new purchase) is available through HeatSource.
-
Raytek MI3 Comm Box System Expansion Accessory XXXMI3CONNBOX - MI3 Comm Box System Expansion Accessory Multi-head interface box for MI3 communications boxes includes field wiring terminal for up to 8 heads and a 5 meter cable to connect to MI3 communications boxes *** LEAD TIME IS 10 - 12 WEEKS *** Raytek MI3 Comm Box System Expansion Accessory is available through HeatSource.

